Construction of the P285 million Balulang-Macasandig Bridge Project has began.
As shown below, work has began on the Macasandig side.
Two vertical structures are seen at right believed to be the bridge’s main support.
The bridge is located right beside the ongoing river dike project (LINK).
Closer shot of the bridge support.
Keep posted.