A pre-construction conference was recently held for stakeholders affected by the flood control project along Cagayan de Oro River at Carmen side.
As shown below, the project will start at Tambo beside COA Office and ends at the back of Liceo de Cagayan University. The length of the dike is approximately more than 600 meters long. Most likely the project will affect several riverside properties.
photos by Ana Castillo Caneda