
After years of inactivity, construction of the much-delayed Opol Boardwalk Project in Opol, Misamis Oriental has finally resumed.
As shown below, structures have already taken shape on the seaside project which costs around P9.61 million.




Here’s the billboard onsite.

Here’s an old rendering. We still don’t know if there’s a revision on the project.

Keep posted.