The slope protection works along Masterson Avenue near Pryce Plaza is now well underway.
As shown in the following photos, excavation works are now observed at the lower slope.
Despite the work, traffic control in the area has been managed.
Note the proximity of the property line of Pryce Plaza (concrete fence).
The slope protection works extend beyond the curve.
Most likely, the completed work will replicate the one shown below.
Keep posted.