Quantcast
Channel: Construction – CDODev.Com
Viewing all articles
Browse latest Browse all 2974

PROJECT WATCH: ACE Medical Center as of March 2018

$
0
0

Construction continues for the 10-storey 300-bed ACE Medical Center located in Brgy. Lapasan, Cagayan de Oro City.

As shown in these latest photos onsite, vertical construction is still ongoing. Accordingly, the contractor is targeting to finish the 6th floor by July 2018.

photo by ACE Medical Center Cagayan De Oro, Inc.
photo by ACE Medical Center Cagayan De Oro, Inc.
photo by ACE Medical Center Cagayan De Oro, Inc.
photo by ACE Medical Center Cagayan De Oro, Inc.

Keep posted.


Viewing all articles
Browse latest Browse all 2974

Trending Articles